<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	
	xmlns:georss="http://www.georss.org/georss"
	xmlns:geo="http://www.w3.org/2003/01/geo/wgs84_pos#"
	
	>
<channel>
	<title>
	Comments on: Caltrans Bay Bridge delays shun private solutions	</title>
	<atom:link href="https://calwatchdog.com/2013/05/20/caltrans-bay-bridge-delays-shun-private-solutions/feed/" rel="self" type="application/rss+xml" />
	<link>https://calwatchdog.com/2013/05/20/caltrans-bay-bridge-delays-shun-private-solutions/</link>
	<description></description>
	<lastBuildDate>Wed, 25 Mar 2015 05:23:23 +0000</lastBuildDate>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	
	<item>
		<title>
		By: Bob Pfahnl		</title>
		<link>https://calwatchdog.com/2013/05/20/caltrans-bay-bridge-delays-shun-private-solutions/#comment-11771</link>

		<dc:creator><![CDATA[Bob Pfahnl]]></dc:creator>
		<pubDate>Fri, 14 Jun 2013 19:18:10 +0000</pubDate>
		<guid isPermaLink="false">http://www.calwatchdog.com/?p=42912#comment-11771</guid>

					<description><![CDATA[The much larger point is the cost overruns.  Originally estimated at $1.5 billion, the cost has more than quadrupled.  The bridge required no land acquisition or other unknowns, just connect two points.  

Can you imagine what will be the ultimate cost and duration of the High Speed Rail project?]]></description>
			<content:encoded><![CDATA[<p>The much larger point is the cost overruns.  Originally estimated at $1.5 billion, the cost has more than quadrupled.  The bridge required no land acquisition or other unknowns, just connect two points.  </p>
<p>Can you imagine what will be the ultimate cost and duration of the High Speed Rail project?</p>
]]></content:encoded>
		
			</item>
		<item>
		<title>
		By: Ernst Ghermann		</title>
		<link>https://calwatchdog.com/2013/05/20/caltrans-bay-bridge-delays-shun-private-solutions/#comment-11770</link>

		<dc:creator><![CDATA[Ernst Ghermann]]></dc:creator>
		<pubDate>Tue, 21 May 2013 17:42:40 +0000</pubDate>
		<guid isPermaLink="false">http://www.calwatchdog.com/?p=42912#comment-11770</guid>

					<description><![CDATA[The deaths from the crushed cars were on the Nimitz Freeway and not on the Bay Bridge. Wikipedia: The highest number of fatalities, 42,[12] occurred in Oakland because of the Cypress Street Viaduct collapse on the Nimitz Freeway (Interstate 880), where the upper level of a double-deck portion of the freeway collapsed, crushing the cars on the lower deck. One 50-foot (15 m) section of the San Francisco – Oakland Bay Bridge also collapsed, leading to a single fatality on the bridge.]]></description>
			<content:encoded><![CDATA[<p>The deaths from the crushed cars were on the Nimitz Freeway and not on the Bay Bridge. Wikipedia: The highest number of fatalities, 42,[12] occurred in Oakland because of the Cypress Street Viaduct collapse on the Nimitz Freeway (Interstate 880), where the upper level of a double-deck portion of the freeway collapsed, crushing the cars on the lower deck. One 50-foot (15 m) section of the San Francisco – Oakland Bay Bridge also collapsed, leading to a single fatality on the bridge.</p>
]]></content:encoded>
		
			</item>
	</channel>
</rss>

<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/


Served from: calwatchdog.com @ 2026-04-14 22:23:12 by W3 Total Cache
-->